FactoryQA
Resources

Quality management, explained plainly.

Guides, definitions and answers for quality managers at small and mid-size manufacturers, from the team behind FactoryQA.

Supplier qualityCertificate of conformance: what it must includeWhat a certificate of conformance must include, how it differs from material and process certs, and how to check a C of C at receiving inspection.GuidePartial (delta) FAI under AS9102 Rev CWhen AS9102 needs a full first article and when a partial (delta) FAI is enough, what triggers each, and how to record the baseline on Form 1.Supplier qualitySupplier quality agreement: a template outlineWhat a supplier quality agreement should include, with a fifteen-section outline to adapt: change control, nonconformance, SCARs, records and access.Supplier qualityAQL sampling for machined parts (ANSI/ASQ Z1.4)How to read ANSI/ASQ Z1.4 AQL tables for machined parts: code letters, sample sizes, accept and reject numbers, switching rules and c=0 plans.GuideGage R&R: how to calculate it and what is acceptableHow to run and calculate a gage R&R study with the average and range method, a worked example, and the AIAG limits: under 10%, 10 to 30%, over 30%.GuideCalibration intervals: how often to calibrate each gageHow often to calibrate calipers, micrometers and other gages: typical starting intervals, adjusting from as-found data, and out-of-tolerance impact checks.Supplier qualityAS9145 for small aerospace suppliersAS9145 explained for small aerospace suppliers: the five APQP phases, the eleven PPAP elements, what applies to build-to-print shops, and low volumes.Supplier qualityPPAP vs first article inspection (FAI)PPAP vs first article inspection: what each proves, the standards behind them (AIAG, AS9145, AS9102), a side by side table, and when you need both.GuideISO 9001:2026: what changed and what to doISO 9001:2026 was published in September 2026. What changed, the September 30, 2029 transition deadline, and what it means for AS9100 and IATF 16949.GuideWill an auditor accept AI-written QMS documents?Will an auditor accept AI-written procedures? What ISO 9001 clause 7.5 requires, how AI-written documents fail audits, and how to make them your own.GuideTurning procedures into training courses with AIHow to turn an approved procedure into a training course and quiz with AI, what to review before assigning it, and how it supports ISO 9001 clause 7.2.GuideRoot cause analysis with an AI assistant: a worked exampleA worked root cause analysis for a machining defect: fishbone, 5 Whys, the escape cause and verification, and where an AI assistant helps or cannot.GuideAI for PFMEAs and control plansHow to use AI to draft a PFMEA and control plan: what to let it write, and the ratings, causes, sample sizes and reaction plans a team must confirm.GuideAI in quality management: what it can and cannot doWhat AI does well in quality management today, what it cannot do, and how a small manufacturer can use it safely with human review and audit-ready records.ComparisonAI-powered QMS software compared (2026)What eleven QMS products do with AI, compared from vendor websites: gap assessments, drawing ballooning, CAPA help, document drafting and training.Supplier qualityHow to fill out a PSW (part submission warrant)How to fill out a part submission warrant (PSW) field by field: part details, submission reason and level, results, declaration, and why warrants get rejected.GuideHow AI reads an engineering drawingHow AI ballooning reads dimensions, tolerances and GD&T off an engineering drawing, where it goes wrong, and what to review before a first article.GuideHow to run an ISO 9001 or AS9100 gap assessment with AIHow to run an ISO 9001, AS9100, IATF 16949 or ISO 13485 gap assessment with AI: what to upload, which check to run, and how to read and close the findings.ComparisonBest QMS software for machine shops and job shops (2026)Nine QMS options for machine shops and job shops compared from vendor websites: pricing, AS9102 and ballooning, SPC, supplier portals and ERP fit.Supplier qualityAS9100 8.4.3 flow-down: what your purchase orders must sayWhat AS9100 clause 8.4.3 says to flow down to suppliers, with sample purchase order quality clauses and the DFARS, CMMC and ITAR clauses that often apply.Supplier qualityIncoming inspection for machine shopsA receiving inspection procedure for machine shops: paperwork checks, risk-based sampling with Z1.4 or c=0 plans, accept or reject, and supplier feedback.GuideMRB and dispositions: use as is, rework, repair, scrapHow a material review board decides on nonconforming parts: use as is, rework, repair, return, regrade or scrap, and what AS9100 requires for each.GuideAS9102 Form 3, field by field (Rev C)How to fill in AS9102 Form 3 field by field for Rev C: characteristic numbers, requirements, results, tooling and NCR numbers, plus partial FAI rules.Supplier qualityPPAP levels and the 18 elements, explainedPPAP levels 1 to 5 and all 18 AIAG PPAP elements in one table: what each level submits, what triggers a new PPAP, the PSW and interim approval.Supplier qualityHow to respond to a SCAR (with an 8D example)How to respond to a customer SCAR: containment, occurrence and escape root causes, corrective actions that get accepted, and a worked 8D example.Supplier qualitySCAR vs CAR vs CAPA vs 8D: what is the difference?NCR, CAR, SCAR, CAPA and 8D explained: what each one is, who owns it, when to open it and how they fit together, with a comparison table and an example.Supplier qualityCustomer complaints and supplier inspections in one QMSWhy customer complaints and incoming supplier inspections belong in the same QMS, how the loop between them closes, and what software should do for both.GuideQMS software for metal fabrication: what to look forWhat a metal fabrication shop should look for in QMS software: drawing-based inspection, welder qualifications, outside processors, NCRs, gages and PM.GuideWhy manufacturers outgrow paper-based quality systemsSeven signs a paper quality system is holding your plant back, what a digital QMS changes for compliance, visibility and speed, and how to switch safely.GuideHow to centralize quality in one cloud QMSWhy NCRs, audits, supplier inspections and reports fall apart in separate files, how they connect in one cloud QMS, and the order to bring them in.

Try it on your own process: start free.

Free plan · Basic $40 · Pro $60 per standard user per month · 14 days of Pro to start