A certificate of conformance (C of C) is a supplier's signed statement that what they shipped meets the purchase order. Aerospace customers ask for one with almost every shipment, and receiving inspectors file thousands of them. A C of C is only worth filing if someone checks it: a certificate that names the wrong revision, or no specification at all, certifies nothing.
What a C of C should contain
- The supplier's name and address
- Your purchase order number, and the line item where relevant
- Part number and revision, and the drawing revision if different
- Quantity shipped
- Lot, batch, heat or serial numbers that give traceability
- The specifications and revisions the product was made, processed or tested to
- A statement that the product conforms to the purchase order requirements
- The name, title and signature of an authorized representative, and the date
Your customer's requirements may add items: country of origin, a statement on counterfeit part prevention, shelf life and cure dates, or a reference to the first article report. Put what you need on the purchase order, so the supplier knows before they ship.
C of C, material cert, process cert: not the same thing
| Document | What it certifies | Who issues it |
|---|---|---|
| Certificate of conformance | The shipment meets the purchase order | Your supplier |
| Material certification (mill test report) | Chemistry and mechanical properties of a heat or lot of material | The mill or material producer |
| Special process certification | Heat treat, plating, NDT or welding was done to a named specification | The processor |
| Certificate of analysis | Test results for a batch of a chemical or compound | The manufacturer or a lab |
Checking one at receiving
- PO number, part number and revision match your order
- Quantity and lot or serial numbers match the packing slip and the parts
- Each specification and revision on the PO appears on the certificate
- Material heat numbers trace to the mill certification, and the properties are within the specification
- Special processes were done by an approved source
- It is signed and dated
A mismatch is a nonconformance. Hold the lot until it is resolved (see incoming inspection for machine shops).
Can a C of C replace inspection?
Sometimes. ISO 9001 and AS9100 let you set the type and extent of control by risk and supplier performance, so certificate review alone can be enough for low-risk items from a proven supplier. AS9100 also expects you to validate test reports for raw material identified as a significant operational risk, for example by periodic independent testing. A certificate alone is rarely enough for key characteristics or for a new supplier.
Writing your own
When you ship, your C of C makes the same statement to your customer, and it rests on your suppliers' certificates. Do not sign for a specification revision you did not verify. Keep the supporting certificates with the job record for the retention period your customer requires, which in aerospace is often ten years or more.
Related: keeping supplier certificates current, AS9100 8.4.3 flow-down and counterfeit parts prevention.
In FactoryQA, an AS9102 first article records each material and special process on Form 2 with its specification, supplier and certificate of conformance number. Supplier quality certifications such as AS9100 and Nadcap are tracked on the supplier record with expiry dates and reminders. See Supplier Quality and Inspection.
Frequently asked questions
What is a certificate of conformance?
A signed statement from a supplier that the products or services in a shipment meet the requirements of the purchase order, identifying the part, revision, quantity, lot and the specifications it was made to.
What should a certificate of conformance include?
The supplier, purchase order number, part number and revision, quantity, lot or serial numbers, the specifications and revisions met, a statement of conformance, and an authorized signature with the date.
Is a certificate of conformance the same as a material certification?
No. A C of C certifies that a shipment meets the order. A material certification, or mill test report, gives the chemistry and properties of a specific heat or lot of material.
Does AS9100 require a certificate of conformance?
AS9100 does not require one by name. Customers usually require it through purchase order clauses, and AS9102 Form 2 asks for the certificate of conformance number for materials and special processes.
How long should certificates of conformance be kept?
For the retention period your customer and regulations require. In aerospace this is commonly ten years or more; check each contract.