---
title: Partial (delta) FAI under AS9102 Rev C | FactoryQA
description: When AS9102 needs a full first article and when a partial (delta) FAI is enough, what triggers each, and how to record the baseline on Form 1.
image: https://factoryqa.com/hubfs/fqa-og-res-partial-fai-as9102.png
---

[![FactoryQA](https://factoryqa.com/hubfs/fqa-logo-white.png)](https://factoryqa.com/)

Features

[**Platform overview**Every module, and how they connect](https://factoryqa.com/feature-overview)[**AI features**Purpose-built AI in every module](https://factoryqa.com/ai-powered-quality-management)[**Integrations**ERP connectors and imports](https://factoryqa.com/integrations)

[**Dashboard**Every module in one scorecard](https://factoryqa.com/products/qualitybi-dashboard)[**Tasks**Every to-do, from every module](https://factoryqa.com/products/task-management)[**Compliance**Readiness for your standard](https://factoryqa.com/products/compliance)[**Quality Plans**Ballooning, PFMEA, control plans, PPAP](https://factoryqa.com/products/quality-plans)[**Documents**Revisions, approvals, sign-offs](https://factoryqa.com/products/document-control)[**Issues**NCRs, CAPAs and SCARs](https://factoryqa.com/products/non-conformance-management)[**Inspection**Sheets, first articles and SPC](https://factoryqa.com/products/inspection-sheets)[**Calibration**Gages, due dates and Gage R&R](https://factoryqa.com/products/calibration-management)[**Preventive Maintenance**Scheduled work orders and repairs](https://factoryqa.com/preventive-maintenance-factoryqa)[**Supplier Quality**Approved suppliers, portal and SCARs](https://factoryqa.com/products/supplier-management)[**Audits**Schedules, checklists and findings](https://factoryqa.com/products/audit-management)[**Learning Management**Courses, quizzes and the training matrix](https://factoryqa.com/products/learning-management-system)[**QMS Generator**Your manual from an interview](https://factoryqa.com/products/qms-generator)

Services

[**Services overview**Certification, consulting and supplier quality](https://factoryqa.com/services)[**Get Certified**Three paths to AS9100, ISO 9001 or ISO 13485: do it yourself, join a workshop, or work 1-1 with a consultant.](https://factoryqa.com/certification-services)[**Certification Workshops**A 9-week, small-group program with 18 expert-led sessions and an AI-built document kit.](https://factoryqa.com/certification-cohorts)[**QMS Consulting**A consultant on your team from training through implementation, internal audit and the registrar audit.](https://factoryqa.com/qms-consulting)[**Supplier Quality Services**Qualification, management, training and security services for your whole supply base.](https://factoryqa.com/supplier-quality-services)

[Pricing](https://factoryqa.com/pricing)

[Log in](https://app.factoryqa.com/auth/login)[Book a demo](https://factoryqa.com/get-a-demo)[Start free](https://app.factoryqa.com/auth/register)

Features[**Platform overview**](https://factoryqa.com/feature-overview)[AI features](https://factoryqa.com/ai-powered-quality-management)[Integrations](https://factoryqa.com/integrations)[Dashboard](https://factoryqa.com/products/qualitybi-dashboard)[Tasks](https://factoryqa.com/products/task-management)[Compliance](https://factoryqa.com/products/compliance)[Quality Plans](https://factoryqa.com/products/quality-plans)[Documents](https://factoryqa.com/products/document-control)[Issues](https://factoryqa.com/products/non-conformance-management)[Inspection](https://factoryqa.com/products/inspection-sheets)[Calibration](https://factoryqa.com/products/calibration-management)[Preventive Maintenance](https://factoryqa.com/preventive-maintenance-factoryqa)[Supplier Quality](https://factoryqa.com/products/supplier-management)[Audits](https://factoryqa.com/products/audit-management)[Learning Management](https://factoryqa.com/products/learning-management-system)[QMS Generator](https://factoryqa.com/products/qms-generator)

Services[**Services overview**](https://factoryqa.com/services)[Get Certified](https://factoryqa.com/certification-services)[Certification Workshops](https://factoryqa.com/certification-cohorts)[QMS Consulting](https://factoryqa.com/qms-consulting)[Supplier Quality Services](https://factoryqa.com/supplier-quality-services)More[**Pricing**](https://factoryqa.com/pricing)[Log in](https://app.factoryqa.com/auth/login)[Book a demo](https://factoryqa.com/get-a-demo)

Guide

# Partial (delta) FAI under AS9102 Rev C

When AS9102 needs a full first article and when a partial (delta) FAI is enough, what triggers each, and how to record the baseline on Form 1.

FactoryQA quality teamNovember 29, 2026

A full first article inspection accounts for every design characteristic of a part. When something changes later, AS9102 does not always require you to start again: a partial FAI, often called a delta FAI, covers only the characteristics affected by the change and points back to the earlier report as its baseline. Getting this right saves days of inspection; getting it wrong gets the report rejected.

Something changedList the affected characteristicsCheck customer requirements**Are all characteristics affected?**

Yes · full FAINo · partial FAI on the affected ones, referencing the baseline

## What triggers a new FAI

- A change in the design affecting fit, form or function
- A change in manufacturing source, process, inspection method, location, tooling or materials that can affect fit, form or function
- A change in numerical control program or translation to another media that can affect fit, form or function
- A natural or man-made event that may adversely affect the manufacturing process
- A lapse in production of two years, or as specified by the customer

## Full or partial

| Situation | Usually | Re-inspect |
| --- | --- | --- |
| Drawing revision changes two dimensions | Partial | The changed characteristics and any they affect |
| New program or fixture for one operation | Partial | Characteristics produced in that operation |
| New plating or heat treat supplier | Partial | Characteristics the process affects, and Form 2 for the new source |
| Move to a different machine type | Partial or full | Everything that machine produces; often all |
| Move to another manufacturing site | Full | All characteristics |
| Two-year lapse in production | Full, unless the customer agrees otherwise | All characteristics |
| Customer or contract requires it | Full | All characteristics |

The deciding question is which characteristics the change could have affected. If you cannot draw that line with confidence, do a full FAI.

## How to document a partial FAI

1. On Form 1, mark the FAI as partial, enter the baseline part number or FAIR it builds on, and state the reason
2. On Form 3, list the affected characteristics with their requirements and new results
3. On Form 2, update any material, special process or functional test that changed
4. Keep the baseline FAIR with the partial one: together they are the complete record

Rev C of AS9102 made the full or partial choice, the baseline and the reason explicit fields on Form 1. See [AS9102 Form 3, field by field](https://factoryqa.com/resources/as9102-form-3-guide).

## Common mistakes

- Re-inspecting only the dimensions that changed, and missing ones the change affects (a moved hole changes a position callout and an edge distance)
- No baseline reference, so the partial FAIR cannot stand on its own
- A chain of partials with no full FAI anyone can find
- Treating a new sub-tier processor as "no change"
- Forgetting the two-year lapse on a repeat job

Related: [PPAP vs FAI](https://factoryqa.com/resources/ppap-vs-fai) and [how AI reads an engineering drawing](https://factoryqa.com/resources/how-ai-reads-engineering-drawings).

Inspection in FactoryQA: sheets built from the ballooned drawing, graded as results are entered.

In FactoryQA, releasing a new drawing revision re-issues the part's inspection sheets. From the earlier AS9102 entry you start a Delta-FAI: Forms 1 and 2 and the results of every unchanged characteristic carry over, the changed and new characteristics are left blank to measure, and the partial FAI fields on Form 1 are filled in. See [Inspection](https://factoryqa.com/products/inspection-sheets).

## Frequently asked questions

### What is a partial FAI?

A first article inspection that covers only the characteristics affected by a change, with a reference to the earlier full FAI as its baseline. It is also called a delta FAI.

### When is a full FAI required again?

When a change could affect all characteristics, such as a move to another site, after a two-year lapse in production unless the customer agrees otherwise, and whenever the customer or contract requires it.

### Does a drawing revision always need a new FAI?

It needs at least a partial FAI on the characteristics the revision changed or affects, when the change affects fit, form or function.

### How do I record a partial FAI on AS9102 Form 1?

Mark the FAI as partial, enter the baseline part number or FAIR, and state the reason for the partial FAI. Rev C of AS9102 has fields for each.

### How long is a first article inspection valid?

Until something changes that affects the part, or production lapses for two years. There is no fixed expiry while the same process keeps running.

Keep reading

## More from Resources

[Supplier quality**Certificate of conformance: what it must include**What a certificate of conformance must include, how it differs from material and process certs, and how to check a C of C at receiving inspection.](https://factoryqa.com/resources/certificate-of-conformance-requirements)[Supplier quality**Supplier quality agreement: a template outline**What a supplier quality agreement should include, with a fifteen-section outline to adapt: change control, nonconformance, SCARs, records and access.](https://factoryqa.com/resources/supplier-quality-agreement-template)[Supplier quality**AQL sampling for machined parts (ANSI/ASQ Z1.4)**How to read ANSI/ASQ Z1.4 AQL tables for machined parts: code letters, sample sizes, accept and reject numbers, switching rules and c=0 plans.](https://factoryqa.com/resources/aql-sampling-for-machined-parts)

## Try it on your own process: start free.

Free plan · Basic $40 · Pro $60 per standard user per month · 14 days of Pro to start

[Start free](https://app.factoryqa.com/auth/register)[Book a demo](https://factoryqa.com/get-a-demo)

![FactoryQA](https://factoryqa.com/hubfs/fqa-logo-white.png)Every quality tool. One connected system.

Product[Features](https://factoryqa.com/feature-overview)[AI features](https://factoryqa.com/ai-powered-quality-management)[Integrations](https://factoryqa.com/integrations)[Pricing](https://factoryqa.com/pricing)

Modules[Quality Plans](https://factoryqa.com/products/quality-plans)[Documents](https://factoryqa.com/products/document-control)[Issues](https://factoryqa.com/products/non-conformance-management)[Inspection](https://factoryqa.com/products/inspection-sheets)[Calibration](https://factoryqa.com/products/calibration-management)

Services[Get Certified](https://factoryqa.com/certification-services)[Certification Workshops](https://factoryqa.com/certification-cohorts)[QMS Consulting](https://factoryqa.com/qms-consulting)[Supplier Quality Services](https://factoryqa.com/supplier-quality-services)

Resources[Guides](https://factoryqa.com/resources)[FAQ](https://factoryqa.com/resources/faq)[Glossary](https://factoryqa.com/resources/quality-glossary)

Company[Contact](https://factoryqa.com/get-a-demo-1)[Help Center](https://app.factoryqa.com/help)[LinkedIn](https://www.linkedin.com/company/factoryqa)[Facebook](https://www.facebook.com/factoryqa)

© 2026 FactoryQA[Privacy Policy](https://factoryqa.com/privacy-policy) · [Terms and Conditions](https://factoryqa.com/terms-and-conditions)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "FactoryQA quality team",
    "url" : "https://factoryqa.com/resources/author/factoryqa-quality-team"
  },
  "dateModified" : "2026-11-29T16:28:46.747Z",
  "datePublished" : "2026-11-29T16:28:46.000Z",
  "headline" : "Partial (delta) FAI under AS9102 Rev C | FactoryQA",
  "image" : [ "https://factoryqa.com/hubfs/fqa-og-res-partial-fai-as9102.png" ],
  "mainEntityOfPage" : {
    "@id" : "https://factoryqa.com/resources/partial-fai-as9102",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://20847757.fs1.hubspotusercontent-na1.net/hubfs/20847757/264.png"
    },
    "name" : "FactoryQA"
  }
}
```

```json
{
  "@context" : "https://schema.org",
  "@type" : "Article",
  "author" : {
    "@type" : "Organization",
    "name" : "FactoryQA",
    "url" : "https://factoryqa.com/"
  },
  "dateModified" : "2026-11-29",
  "datePublished" : "2026-11-29",
  "description" : "When AS9102 needs a full first article and when a partial (delta) FAI is enough, what triggers each, and how to record the baseline on Form 1.",
  "headline" : "<span id=\"hs_cos_wrapper_name\" class=\"hs_cos_wrapper hs_cos_wrapper_meta_field hs_cos_wrapper_type_text\" style=\"\" data-hs-cos-general-type=\"meta_field\" data-hs-cos-type=\"text\" >Partial (delta) FAI under AS9102 Rev C</span>",
  "image" : "https://factoryqa.com/hubfs/fqa-og-res-partial-fai-as9102.png",
  "mainEntityOfPage" : "https://factoryqa.com/resources/partial-fai-as9102",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://factoryqa.com/hubfs/fqa-logo-white.png"
    },
    "name" : "FactoryQA",
    "url" : "https://factoryqa.com/"
  }
}
```

```json
{
  "@context" : "https://schema.org",
  "@type" : "FAQPage",
  "mainEntity" : [ {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "A first article inspection that covers only the characteristics affected by a change, with a reference to the earlier full FAI as its baseline. It is also called a delta FAI."
    },
    "name" : "What is a partial FAI?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "When a change could affect all characteristics, such as a move to another site, after a two-year lapse in production unless the customer agrees otherwise, and whenever the customer or contract requires it."
    },
    "name" : "When is a full FAI required again?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "It needs at least a partial FAI on the characteristics the revision changed or affects, when the change affects fit, form or function."
    },
    "name" : "Does a drawing revision always need a new FAI?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Mark the FAI as partial, enter the baseline part number or FAIR, and state the reason for the partial FAI. Rev C of AS9102 has fields for each."
    },
    "name" : "How do I record a partial FAI on AS9102 Form 1?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Until something changes that affects the part, or production lapses for two years. There is no fixed expiry while the same process keeps running."
    },
    "name" : "How long is a first article inspection valid?"
  } ]
}
```